A very nice to have is to be able to schedule a Pipeline Deployment, and here is how it would work:


Required Items and Things to consider:

  • Have the report already existing in both Pipeline Workspaces.
  • Have the Gateway Connections configured.
  • The Production data has to be already available for the report to consume when the schedule is set.


Process:

  • Schedule the time and date when you want to publish the report.
  • This will trigger a pre-check:
  • The report will access the Prod Data
  • Run a Refresh to ensure no Errors pop up.
  • If all is good, then return to the schedule page to finish the process.
  • If an error occurs, pop the refresh error so the developer can correct it.
  • Request the contact information of the Admin that will be "On-Call" if something happens.


Any other steps that need to be taken into consideration?