Rodrigo Landeros on 07 Sep 2022 14:30:45
A very nice to have is to be able to schedule a Pipeline Deployment, and here is how it would work:
Required Items and Things to consider:
- Have the report already existing in both Pipeline Workspaces.
- Have the Gateway Connections configured.
- The Production data has to be already available for the report to consume when the schedule is set.
Process:
- Schedule the time and date when you want to publish the report.
- This will trigger a pre-check:
- The report will access the Prod Data
- Run a Refresh to ensure no Errors pop up.
- If all is good, then return to the schedule page to finish the process.
- If an error occurs, pop the refresh error so the developer can correct it.
- Request the contact information of the Admin that will be "On-Call" if something happens.
Any other steps that need to be taken into consideration?