- Comments (361)
- Merged Idea (10)
Comments (361)
Merged Idea (10)
RE: Load data from Office 365 Planner to PowerBI
I am pretty sure that meant "create a connection between Office 365 Planner and PowerBI". If so, then I am all for it.
RE: Load data from Office 365 Planner to PowerBI
I would also like to have this feature of connectivity between microsoft planner and Power BI
RE: Load data from Office 365 Planner to PowerBI
I have this necessity too. I need to create dashboards on Power BI from Planner information
RE: Load data from Office 365 Planner to PowerBI
The missing Project Summary WebPart could be partwise replaced by this!
RE: Load data from Office 365 Planner to PowerBI
I think it has to be there!
RE: Load data from Office 365 Planner to PowerBI
Would love to have Planner data as a direct source in Power BI!
RE: Load data from Office 365 Planner to PowerBI
Must have feature
RE: Load data from Office 365 Planner to PowerBI
It's essential project managers are able seeing who is working on what meaning on an overall level not just on top of a single plan
RE: Load data from Office 365 Planner to PowerBI
Absolut the most valuable feature to be added.
RE: Load data from Office 365 Planner to PowerBI
This is a much needed feature